Tweedy Blvd Traffic Signal Synchronization Project, CIP No. 514-TRF

Closing date July 28, 2022, 10:00 AM

The work to be performed shall include, but not be limited to: traffic signal conduit installation; traffic signal pull box replacements and new installations; traffic signal fiber optic interconnect installation; new traffic signal controller installation; new traffic signal cabinet installation on new foundation(s); CCTV camera installation; Ethernet switch installation; Video Detection System (VDS) installation, and other items not mentioned here, but are required by the Technical Provisions. 

 

Please follow the ebidboard link below to access the plans and specifications

http://www.ebidboard.com/public/projects/index.asp?mbrguid={BF2C74EF-A2E4-4DE1-838F-6B35DAA0E099}