Construction of South Gate Park Fencing Improvements 550-PRK

Closed September 14, 2023, 10:00 AM

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Specifications and Contract Documents. The general items of work include replacement of chain link fence fabric, installation of new chain-link and tube steel fencing, backstops, concrete bands, dug outs, concrete flatwork, ac paving, gates and other related items that are required by the Contract Documents at the following locations at South Gate Park: Fields 1-10, Horseshoe Pits, Tennis Courts, Sports and Aquatic Center, City Yard and Parking Lot.

The project is located at 4900 Southern Ave, South Gate, CA 90280.

A MANDATORY PRE-BID CONFERENCE WILL BE HELD ON SEPTEMBER 6, 2023 AT

9:00 A.M. The meeting will be held at the SOUTH GATE PARK AUDITORIUM, 4900 SOUTHERN AVENUE IN SOUTH GATE.

***Addendum No. 1 is now available. Please click here to view(PDF, 135KB) **

Wage Determination(PDF, 135KB)